Fertilizer Machine & Production Line

Some Tips about Starting Fertilizer Business

Sufficient Raw Materials

Sufficient supply of goods is needed to build a factory. Because the raw materials are not suitable for long-distance transportation, so building factory should consider whether there is a farm, food factory, sugar factory, and winery and so on.

Requirements for Selecting Site

The sit should be built on high ground, where is dry, flat, and well drained. The site area can be determined according to the management mode, plant layout, etc.

Water And Electricity

The water supply in the fermentation workshop and the granulation processing workshop should be adequate and regular. Complete sets of processing equipment and some single machine also need a stable power supply.

Social Bond

This refers to the connection between the fertilizer plant and the surrounding society, such as the connection with residential areas, supply of transportation and electricity, etc. Therefore, the location selection for the fertilizer plant must comply with social public health standards, so that the plant will not become the pollution source of the surrounding environment, and not be polluted by the surrounding environment.

Prev:
Next: