Notes for The Fertilizer Granulator during Operation
After the machine is installed according to the requirements, please refer to the operation manual in detail and get familiar with the machine structure before using the machine.
Check whether all lines are connected correctly and whether the water and electricity supply is normal before starting up.
When using the new machine, warm the machine to the required temperature first is necessary.
After closing the machine, first open the waste valve to drain the materials stored in the box.
If the material output is reduced during the production, then the hole of the screen may be blocked, so first stop the extrusion machine and then open the waste valve. After the box pressure drops, then replace the screen.